180-Ton Hydrocracker High-Pressure Reactor
Executed twin-arc automated submerged arc welding with 347 stainless weld overlay cladding, followed by computerized 620°C furnace PWHT and 100% Phased Array Ultrasonic Testing.
Discover how our engineering, metallurgy, and heavy fabrication teams solved complex technical challenges to deliver zero-defect turnkey systems for premier energy operators.
OIL & GAS / REFINING
Executed twin-arc automated submerged arc welding with 347 stainless weld overlay cladding, followed by computerized 620°C furnace PWHT and 100% Phased Array Ultrasonic Testing.
OFFSHORE & MARINE
Completed complete orbital TIG piping spools, structural skid base fabrication, FAT pressure testing at 450 bar, and marine 3-coat epoxy paint preservation.
NUCLEAR POWER
Utilized heavy 4-roll CNC plate rolling with internal laser tracking spider bracing, followed by complete radiography and third-party Authorized Nuclear Inspector (ANI) signoff.
HEAVY INFRASTRUCTURE
Completed full shop trial assembly in our 50,000 sq ft bay, 100% magnetic particle inspection on critical node joints, and barge loading logistics.
POWER GENERATION
Performed precision horizontal boring and milling on 14-meter travel bed with laser CMM coordinate mapping and high-temperature dimensional stability verification.